Estimate Sheet · Rev. 2026

Know your construction
cost before you build

A live preliminary budget calculation, plus a direct line to our senior civil engineers for an official, itemized BOQ — no surprises, no guesswork.

Not to scale
Recently completed turnkey residence
10 Marla · TurnkeyPKR 5,400 / sqft

Interactive Cost Calculator

Real-time estimation engine
3,300 sqft
1,0007,50015,000
Estimate Slip10 Marla · Turnkey
Estimated Budget Range
PKR 16.9018.70 Crore
Unit rate basePKR 5,400 / sqft
GradeExecutive

Get the official BOQ

Receive an itemized architectural cost sheet with exact quantities via WhatsApp.

What shapes your budget

Six variables that move the number

REF—01

Raw Material Market Rates

Fluctuations in steel (60-grade), cement, bricks, and aggregate prices directly impact structural costs.

REF—02

Soil Condition & Site Preparation

Soft soil or deep depression plots require extra foundation depth, raft footing, and site filling.

REF—03

Covered Area & Architectural Layout

Multi-story layouts, high ceilings, basements, and complex spans alter concrete and rebar requirements.

REF—04

Finishing Material Standards

Choice of Spanish vs local tiles, solid wood vs MDF doors, and luxury sanitary fittings affects Turnkey rates.

REF—05

Society Regulations & Approvals

Society scrutiny fees, map approval charges, and strict bylaws in DHA, Bahria, or CDA.

REF—06

Engineering Supervision & Labor

Professional project management prevents material waste and rework, saving up to 15% overall.

Scope comparison

Grey Structure vs. Turnkey Finish

Grey structure under constructionGrey Structure
Completed turnkey finished homeTurnkey Finish
Included Deliverable
Grey
Turnkey
Site Excavation & Soil Compaction
Reinforced Concrete Foundation (RCC)
Solid Brick Masonry (A-Category)
Roof Slab & Waterproofing Membrane
Underground Electrical Conduits & Boxes
Piping for Sewerage, Drainage & Water
Internal & External Cement Plastering
Main Gate & Safety Grill Installation
Floor Tiling (Porcelain / Marble / Granite)
False Ceilings & Decorative Lighting
Modular Kitchen Cabinets & Countertops
Imported Sanitary Ware & Vanity Units
Solid Wood Doors & Wardrobes
Premium Interior / Exterior Paint (ICI/Jotun)
Aluminum / UPVC Windows with Double Glass

Standard client privileges

Always included, no added fees

Every project contracted with Century 21 Developers automatically receives these engineering safeguards.

Itemized Transparent BOQ

Every single bag of cement, ton of steel, and sqft of tiling is listed upfront with exact unit rates.

Free 3D Architectural Maps

Complete floor plans, 3D elevation renders, structural design, and MEP drawings included.

On-Site Engineering Supervision

Dedicated qualified site engineer overseeing daily progress, material quality, and compliance.

Milestone-Based Payments

No heavy upfront advance. Pay in clear milestones linked directly to physical construction progress.

10-Year Structural Guarantee

We issue a written 10-year warranty on RCC structural integrity and foundation stability.

Live Video Updates for Overseas

HD video feeds, digital progress reports, and WhatsApp updates for client remote monitoring.

Engineers reviewing a blueprint

Free technical consultation

Need a customized BOQ for your plot?

Sit down with our senior project managers and structural engineers to review your plot drawing, evaluate site soil, and optimize your construction budget.

Budgeting questions answered

Construction Cost FAQ

For Grey Structure, rates typically range from PKR 2,400 to PKR 2,900 per sq ft depending on steel and cement prices. For Turnkey (A+ Premium finish), rates range from PKR 4,500 to PKR 6,200+ per sq ft based on your choice of tiles, woodwork, and fixtures.