Know your construction
cost before you build
A live preliminary budget calculation, plus a direct line to our senior civil engineers for an official, itemized BOQ — no surprises, no guesswork.

Interactive Cost Calculator
Real-time estimation engineGet the official BOQ
Receive an itemized architectural cost sheet with exact quantities via WhatsApp.
What shapes your budget
Six variables that move the number
Raw Material Market Rates
Fluctuations in steel (60-grade), cement, bricks, and aggregate prices directly impact structural costs.
Soil Condition & Site Preparation
Soft soil or deep depression plots require extra foundation depth, raft footing, and site filling.
Covered Area & Architectural Layout
Multi-story layouts, high ceilings, basements, and complex spans alter concrete and rebar requirements.
Finishing Material Standards
Choice of Spanish vs local tiles, solid wood vs MDF doors, and luxury sanitary fittings affects Turnkey rates.
Society Regulations & Approvals
Society scrutiny fees, map approval charges, and strict bylaws in DHA, Bahria, or CDA.
Engineering Supervision & Labor
Professional project management prevents material waste and rework, saving up to 15% overall.
Scope comparison
Grey Structure vs. Turnkey Finish
Grey Structure
Turnkey FinishStandard client privileges
Always included, no added fees
Every project contracted with Century 21 Developers automatically receives these engineering safeguards.
Itemized Transparent BOQ
Every single bag of cement, ton of steel, and sqft of tiling is listed upfront with exact unit rates.
Free 3D Architectural Maps
Complete floor plans, 3D elevation renders, structural design, and MEP drawings included.
On-Site Engineering Supervision
Dedicated qualified site engineer overseeing daily progress, material quality, and compliance.
Milestone-Based Payments
No heavy upfront advance. Pay in clear milestones linked directly to physical construction progress.
10-Year Structural Guarantee
We issue a written 10-year warranty on RCC structural integrity and foundation stability.
Live Video Updates for Overseas
HD video feeds, digital progress reports, and WhatsApp updates for client remote monitoring.

Free technical consultation
Need a customized BOQ for your plot?
Sit down with our senior project managers and structural engineers to review your plot drawing, evaluate site soil, and optimize your construction budget.
Budgeting questions answered
Construction Cost FAQ
For Grey Structure, rates typically range from PKR 2,400 to PKR 2,900 per sq ft depending on steel and cement prices. For Turnkey (A+ Premium finish), rates range from PKR 4,500 to PKR 6,200+ per sq ft based on your choice of tiles, woodwork, and fixtures.